| Shown above is the ruptured pipe that leaked some 20 tonnes of uranium, plutonium and nitric acid liquor onto the fuel clarification cell floor at Sellafield’s Thorp reprocessing facility over a period of eight months. Beneath the visible crack is the top of Thorp’s Accountancy tank B, which was photographically inspected on April 18th, 2005 when an unexpected weight loss in the tank’s contents prompted the investigation. The ruptured pipe itself measures 40 millimeters in diameter. This photograph was released to Bellona on July 8th, 2005, which represented the first published photographic evidence of the leak. |